Santa Fe Streetscape Improvements

Santa Fe Streetscape Improvements

Denver’s Department of Transportation & Infrastructure (DOTI) will transform a stretch of Santa Fe Drive between 6th and Colfax Avenues into a safer street that aims to enhance the experience for people who walk the corridor, which is home of the Art District on Santa Fe, a popular destination for residents and visitors.

For over two years, DOTI collaborated with the community to create a new street design for Santa Fe Drive within the Art District that will enhance safety for all users and pedestrians, in particular.


Safety treatments being implemented along the corridor from 6th to Colfax Avenues include:

  • Reconfiguring Santa Fe from three travel lanes to two to calm traffic and reduce vehicle speeds; the reconfiguration will center the vehicle travel lanes and add a five-foot buffer between the on-street parking spaces and existing sidewalk to provide people with more space and comfort to walk.
  • Using bollards and paint at intersections to shorten the crossing distance for pedestrians
  • New signage to dedicate left turn lanes at the intersections of 6th, 7th, 8th, and 11th Avenues to accommodate traffic flow
  • Adding two “parklets” adjacent to the sidewalk to provide a place for people to sit and gather
  • New bike racks to provide people on bikes/scooters dedicated places to park and reduce conflicts with pedestrians on the sidewalk
  • Realigning bus stops for better placement and spacing to make bus travel more efficient
  • More seating, planters, and lighting enhancements to improve pedestrian visibility, safety and comfort

Additionally, in late October, local artists Jennifer Chaparro, Alexi High, and Bimmer Torres will paint street murals to further enhance the uniqueness of the Santa Fe corridor along the new placemaking buffer for pedestrians at the intersections of 7th, 8th, 9th, 10th and 12th Avenues. 

DOTI will evaluate the streetscape treatments to determine a longer-term vision for the corridor.


Construction Update

Installation of the streetscape improvements along Santa Fe has begun! Below is the installation schedule (weather permitting):

  • Sept. 28 – Oct. 29 — Crews begin the installation of the core streetscape design – removal of current lane markings, new striping, and vertical safety elements.
  • Oct. 30 – Nov. 20 — Artists install street murals on Santa: Fe at 7th Ave., mid-block 8th Ave., 9th Ave. intersection, mid-block 10th,  and 12th Ave. intersection.
  • Nov. 23-27 — Crew installs placemaking elements (parklets, planters, and benches)

While work is underway, there will be lane closures and parking restrictions between 6th and 14th Avenues.